HD Construction

Taping Jointing and Plastering for Data Centres

Taping Jointing and Plastering for Data Centres

High-quality finishes for demanding technical environments

HD Construction provides specialist taping, jointing and plastering services for new-build, expansion and refurbishment projects within the data centre sector.

From taped and jointed plasterboard to smooth plastered surfaces, we create consistent wall and ceiling finishes ready for high-quality decoration, specialist paint systems or protective coatings.

Professional finishes for data centre facilities

Walls and ceilings within a data centre must meet demanding standards for appearance, durability and cleanliness.

Careful surface preparation is particularly important in operational, technical and client-facing areas. Uneven joints, visible fixings and poorly finished surfaces can affect subsequent coatings, delay handover and result in unnecessary remedial work.

HD Construction works closely with main contractors, drylining teams, decorators and other specialists to ensure surfaces are finished to the agreed project requirements.

Our finishing services

Our data centre finishing services can include:

  • Taping and jointing
  • Plasterboard joint finishing
  • Joint reinforcement
  • Internal and external corner finishing
  • Screw-head and fixing coverage
  • Skim plastering
  • Patch plastering
  • Surface preparation
  • Localised repairs
  • Making good around service openings
  • Finishing around access panels
  • Bulkhead and ceiling finishing
  • Preparation for paint systems
  • Preparation for protective coatings
  • Snagging and remedial works

The required finish should be agreed before work begins and should reflect the final decoration, lighting conditions and intended use of the space.

Taping and jointing

Taping and jointing creates a smooth finish across plasterboard joints, corners and fixing points without applying a full plaster skim.

The process normally involves reinforcing the board joints, applying jointing compounds in controlled stages and carefully sanding the completed surface.

Taping and jointing can provide:

  • A smooth and consistent surface
  • Efficient preparation for decoration
  • Clean transitions between plasterboards
  • Defined internal and external corners
  • Compatibility with a wide range of paint finishes
  • Reduced moisture compared with traditional wet plastering

The final result depends on correct board installation, suitable environmental conditions and careful application of each finishing coat.

Plastering services

Where specified, HD Construction applies plaster finishes to suitable walls, ceilings and plasterboard surfaces.

Our plastering work can include:

  • Full skim coats
  • Localised plaster repairs
  • Finishing to plasterboard systems
  • Making good around altered services
  • Repairs following access or remedial work
  • Preparation of existing backgrounds
  • Finishing around doors, panels and openings

Before plastering begins, we check that the background is suitable, stable and prepared for the proposed finish.

Ready for decoration and protective coatings

Different data centre areas may require different decorative or protective finishes.

Technical spaces may use durable or specialist coatings, while offices, corridors and client-facing areas may require a high-quality decorative appearance. The preparation standard should match the selected final finish.

Our team works to provide surfaces that are:

  • Smooth and consistent
  • Free from visible ridges and excessive sanding marks
  • Properly finished around corners and openings
  • Ready for the specified decoration system
  • Clean and prepared for inspection
  • Protected from damage by following trades

The decorating or coating contractor should confirm any specific substrate and preparation requirements before application.

Walls and ceilings

Our teams finish a range of internal surfaces, including:

  • Drylined partitions
  • Independent wall linings
  • MF plasterboard ceilings
  • Bulkheads and changes in level
  • Service enclosures
  • High-level walls
  • Plant and equipment rooms
  • Offices and meeting spaces
  • Corridors and circulation areas
  • Supporting operational rooms

The work is carefully planned around access equipment, mechanical and electrical services and the wider construction programme.

Managing environmental conditions

Taping, jointing and plastering require suitable site conditions to achieve a consistent result.

Factors such as temperature, ventilation, humidity and drying time can affect the finished surface. We coordinate the work with the project team and follow relevant product requirements before progressing between coats.

Completed surfaces must also be protected from water, dust, impact and premature decoration.

Our delivery process

  1. Review the finish requirements

We review the drawings, specification, decoration schedule and required surface standard.

  1. Inspect the background

Plasterboard joints, fixings, corners and existing surfaces are checked before finishing work begins. Any defects that could affect the result are reported.

  1. Prepare the surfaces

Joints, corners, fixings and backgrounds are prepared using the appropriate materials and reinforcement.

  1. Apply the finish

Jointing compounds or plaster are applied in controlled stages, allowing suitable drying time between coats.

  1. Inspect and hand over

The completed surfaces are checked under the agreed inspection conditions, with snagging and remedial work completed before release for decoration.

Quality-control considerations

A successful finish depends on more than the final coat. It begins with correctly installed plasterboard and continues through every preparation and application stage.

Our quality-control approach focuses on:

  • Inspecting boards before finishing begins
  • Checking joints and fixing positions
  • Using compatible materials
  • Reinforcing joints and corners correctly
  • Observing suitable drying times
  • Maintaining clean working areas
  • Checking surfaces before decoration
  • Protecting completed work
  • Managing snags before handover

Lighting conditions can significantly affect how a finished surface appears. The required inspection conditions and finish standard should therefore be agreed by the project team.

Why choose HD Construction

  • Experience in technically demanding construction environments
  • Integrated drylining and finishing capabilities
  • Careful preparation of walls and ceilings
  • Coordination with decorators and specialist coating contractors
  • Consistent finishing standards
  • Structured inspection and snagging
  • Clear communication throughout the project
  • Support through to final handover

Discuss your finishing requirements

If you require taping, jointing or plastering for a new data centre, facility expansion or refurbishment project, speak to HD Construction.

Send us your drawings, finish specification, decoration schedule and programme. Our team will review the package and discuss how we can support your project.

Telephone: 020 3151 8763
Email: info@hdconstruction.co.uk

Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare